References

TECHNOLOGY REGION LENGTH

TUBING DIMENSION

TEMPERATURE U-VALUE W/(m2.K) INSTALLATION DATE
Majus deployed projects
TOR S America 1800m 1/2" x 1"1/2 150°C 1 2005
TOR Middle East 1800m 1"1/2 x 2"3/8 230°C 1.1 2008
I-TUBING W Africa 1800m 2"3/8 x 4"1/2 40°C 0.6 2008
EHT N America 50m   525°C   2009
TOR N America 2500m 1"1/4 x 2"3/8 180°C 0.9 2012
I-TUBING Middle East 2 x 900m 3"1/2 x 5"1/2 305°C 0.7 2012
I-TUBING Middle East 24 x 900m 3"1/2 x 5"1/2 305°C 0.7 2012
I-TUBING Middle East 3 x 900m 3"1/2 x 5"1/2 305°C 0.7 2013
TOR N America 2000m 1"1/4 x 2"3/8 180°C 0.9 2013
I-TUBING Middle East 99 x 900m 3"1/2 x 5"1/2 305°C 0.7 2014
I-TUBING Middle East 900m 3"1/2 x 5" 305°C 0.7 2014
EHT N America 9m 3"1/2 x 5"1/2 525°C   2014
EHT N America 150m 2"7/8 x 4"1/2 525°C   2014
I-TUBING Middle East 100 x 900m 3"1/2 x 5"1/2 305°C 0.7 Fabrication ongoing